Our priority service

Residential Drywall Installation Across the Niagara Region

St Catharines Elite Drywall installs drywall for homes across the Niagara Region, from new builds and basement finishing in St. Catharines and Thorold to additions, garage conversions and full renovations in Niagara Falls, Welland and Grimsby. We hang gypsum board on walls and ceilings, fit corner bead, then tape, mud and sand to a Level 4 or Level 5 paint-ready finish. Homeowners, builders and general contractors all hire us for the same reason: drywall is the only trade we do.

Our crews work with 1/2" board on standard walls, 5/8" on ceilings where sag resistance matters, moisture-resistant board in bathrooms and laundry rooms, and cement board behind tile in wet areas. We coordinate insulation and vapour barrier, detail bulkheads around ductwork and beams, and check every surface under raking work lights before calling a job finished.

More than twenty years and over 1,500 completed jobs across Niagara. Fully insured with $2M liability, WSIB covered, WHMIS and Working at Heights certified.

Most people call us at one of three moments. The framing is up and inspected on a new build. A basement has sat empty for years and it is finally time. Or an addition is closed in and needs boarding before the painter can start.

All three end in the same place: smooth, solid walls that are ready for primer. Getting there properly is what we have done across Niagara for more than twenty years.

Get a free quote

20+
years in the trade
1,500+
jobs completed
$2M
liability insurance
WSIB
fully covered

What drywall installation actually includes

If you have never hired a drywall crew before, the scope is worth spelling out. We supply and deliver the board, hang it on your walls and ceilings, install corner bead at every outside corner, then tape, mud and sand until the surface is flat and paint-ready.

That last part is the half that most people underestimate. Hanging board is fast. Finishing it well is slow, and it is the only part anyone can see once the paint goes on.

We do not paint. We leave you a surface your painter can prime the same day they arrive.

Open stud framing in a Niagara home, inspected and ready for the drywall crew to start boarding

What a complete installation covers

  • Board hanging on walls and ceilings

    We use 1/2" board on standard walls and 5/8" on ceilings, where the extra thickness resists sagging between joists over time. Moisture-resistant board goes in bathrooms, laundry rooms and anywhere humidity sits. Cement board goes behind tile in showers and tub surrounds, because standard board does not belong there no matter what it costs to swap.

    Fastening matters more than people expect. Screws set too deep tear the paper facing and lose their holding power, and screws left proud show through the finish coat later as visible pops.

  • Corner bead and edge detailing

    Every outside corner gets a bead fitted and fastened properly rather than bedded in mud and hoped for. Bullnose, square or archway bead depends on the look you are after and what the rest of the house already has.

  • Taping, mudding and sanding

    Three coats is the standard, with drying time between each one. The first coat embeds the tape, the second fills and widens the joint, and the third feathers it out so the seam disappears under paint.

  • Cleanup and final inspection under work lights

    Before we call a job finished we run work lights across every wall at a low angle. Raking light shows every ridge, every missed screw and every seam that needs one more pass. It is the difference between a wall that looks fine at handover and one that still looks fine in June when the afternoon sun comes through the window.

Choosing the right finish level for your home

This is the question that costs homeowners the most money when it is answered badly, so here is the plain version.

  • Level 4, the standard for most living spaces

    Level 4 is tape embedded in compound, plus three coats with sanding between. It suits flat, matte and eggshell paint, which is what the large majority of Niagara homes use. Bedrooms, hallways, family rooms and finished basements are all Level 4 work.

  • Level 5, and when it is actually worth paying for

    Level 5 adds a full skim coat across the entire surface, not just the joints. It matters in three situations: gloss or semi-gloss paint, very large uninterrupted wall runs, and rooms where strong side light rakes across a wall from a big window.

    Outside those situations, Level 5 is money you will not see. We will tell you that on site rather than quote it and stay quiet. A contractor who upsells you a skim coat for a basement rec room is not doing you a favour.

Get a free quote on your project

Basement finishing in Niagara homes

Basements are the single most common residential drywall job in this region, and they are not just a smaller version of upstairs work.

Below grade, the vapour barrier and the insulation behind your board decide whether the finished space stays dry. We coordinate with whoever is doing that work, or handle it ourselves, and we will not board over insulation that has not been inspected. Covering uninspected work means opening it back up, which is an expensive lesson.

Moisture-resistant board belongs on below-grade walls in most Niagara basements. Ductwork, beams and plumbing runs need bulkheads built and finished cleanly, and bulkhead detailing is where the difference between a good basement and a rough one shows up most.

Installer lifting a drywall panel onto bedroom wall studs during a residential installation

What drywall installation costs in Niagara

Vague pricing helps nobody, so here is the shape of it.

What moves a quote up or down:

For a full breakdown by room and by job type, see our Niagara drywall cost guide.

Project Typical range
Supply, hang, tape and Level 4 finish $2.00 to $3.50 per sq ft of board surface
Basement, 700 to 900 sq ft finished area $6,000 to $11,000
Full home, roughly 2,000 sq ft $18,000 to $30,000
Single room or addition $1,800 to $4,500
  • Ceiling height, since anything above eight feet needs staging and slows every stage
  • Board thickness and any specialty board required
  • Finish level, with Level 5 adding meaningfully to the finishing time
  • How many corners, angles, bulkheads and openings the layout contains
  • Access, stairs and how far board has to be carried
  • Whether existing material has to come out first

How the work runs, start to finish

  • 1. Site check and quote

    We measure, look at access and confirm what is already done. You get a written quote with the scope spelled out. Usually an hour on site.

  • 2. Material delivery and layout planning

    Board arrives and gets distributed through the space. We plan the layout to keep joints out of awkward spots and minimise waste. Half a day to a day.

  • 3. Board installation

    Walls and ceilings hung, corner beads on, everything fastened to pattern. Two to five days for a typical house, one to two for a basement.

  • 4. First coat and taping

    Every joint taped and embedded, screw heads covered. One to two days.

  • 5. Second and third coats

    Wider knives, broader feathering, sanding between coats. Each coat needs roughly 24 hours to dry properly. Three to six days.

  • 6. Final inspection and touch-ups

    Work lights, last sanding pass, touch-ups. One day.

    The drying time between coats is the thing that surprises people most. It cannot be rushed with a fan and a hopeful attitude. A coat closed up wet cracks later, and we would rather tell you that at the quote stage than explain it in a callback.

What we handle and what needs to be ready

  • We provide

    all board and materials, hanging, corner bead, taping, finishing to your chosen level, and cleanup of our work areas.

  • You or your GC provides

    framing complete and inspected, electrical and plumbing rough-ins finished, HVAC installed, blocking in place for anything that will be mounted later, and heat in the space if we are working through a Niagara winter.

    That last one is not a formality. Compound will not cure properly in an unheated space, and a January job in a cold house takes far longer or fails outright.

Why homeowners across Niagara hire us

  • We only do drywall

    We are not a general renovation company fitting drywall in between kitchens and decks. This is the trade, and doing one thing for twenty years produces a different result than doing ten things adequately.

  • 20+ years and 1,500+ jobs completed

    Enough houses in this region that very little surprises us anymore.

  • $2M liability insurance and full WSIB coverage

    If something goes wrong on your property, you are not the one carrying it. Ask any contractor for proof of both before they start, including us.

  • Working at Heights and WHMIS certified

    Relevant the moment your project involves a vaulted ceiling, a stairwell or a two-storey open space.

Get a free quote on your drywall installation

Tell us what you are building and where you are in the process. We will come out, measure, and give you a written quote with the scope and the finish level clearly stated.

Request a quote online.

Residential Drywall Installation on a Niagara jobsite

A few stages from recent work. Every job ends with a raking-light inspection before we call it finished.

  • New drywall sheets delivered and stacked in an empty room before board hanging starts
  • Screwing 5/8 inch drywall to ceiling joists, set flush so no screw pops show through the finish

Frequently asked questions

How long does drywall take for a full house?

Two to three weeks for a typical Niagara home. Roughly a week of hanging, then one to two weeks of taping and finishing, because each coat needs a day to dry. A basement usually runs one to two weeks.

Do I need to be home while you work?

No. Most clients give us access and carry on with their week. We will need you reachable for decisions, and we prefer you walk the space with us before the final coat.

Can you work around my other trades?

Yes, and it is normal. We coordinate with electricians, plumbers and HVAC crews regularly. Everything needs to be roughed in and inspected before we board, so the sequencing usually sorts itself out.

What thickness of drywall do you use on ceilings, and why?

5/8" as standard. It resists sagging between joists over the years far better than 1/2", which is why the small extra material cost is worth it every time.

Do you handle the painting too?

No. We hand over a properly finished, sanded, paint-ready surface. We are happy to recommend painters in the region who are used to working behind us.

Is there a warranty on the workmanship?

Yes. Talk to us about the specific terms when we quote, and we will put them in writing.

Do I need a permit for drywall?

Not for drywall on its own. The larger project it belongs to, such as a basement finish or an addition, will usually need one, and that permit covers the drywall stage.

What happens if a seam cracks after a year?

Call us. Some hairline movement in a new build is normal as the house settles through its first heating season. A seam that opens properly is a workmanship issue and we come back and fix it.

Related work

Services that often go with this one

Residential Drywall Installation across the Niagara Region

We cover every town in Niagara from our shop on Vine Street in St. Catharines. These are the areas where this service comes up most.

Get a free quote on residential drywall installation

Tell us what you are dealing with and roughly where in Niagara you are. For repairs, a photo is usually enough for a number without a site visit.

Call (289) 723-3544